GufuhverflaŠkoda Plzeň
Turbogenerator set 25MW
Gufuhverfla
Škoda Plzeň
Turbogenerator set 25MW
EXW VB aukaskattur bætist við
1.700.000 EUR
framleiðsluár
1995
Ástand
Notað
Staðsetning
Tékkneska lýðveldið 

Myndir sýna
Sýna kort
Upplýsingar um vélina
- Heiti vélar:
- Gufuhverfla
- framleiðandi:
- Škoda Plzeň
- framleiðsluár:
- 1995
- Ástand:
- notaður
- virkni:
- fullkomlega virkur
- Vinnustundir:
- 201.000 h
Verð og staðsetning
EXW VB aukaskattur bætist við
1.700.000 EUR
- Staðsetning:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia

Hringdu
Tæknilegar upplýsingar
- Þrýstingur:
- 19 stöng
- Afl:
- 25.000 kW (33.990,50 hP)
- Inngangstíðni:
- 50 Hz
- Hiti:
- 320 °C
- Heildarþyngd:
- 93.000 kg
- Snúningshraði (hámark):
- 3.000 snúningur/mín.
- Heildarlengd:
- 6.200 mm
- Kælingargerð:
- vatn
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A19313656
- Tilvísunarnúmer:
- TG3
- uppfærsla:
- síðast þann 06.06.2025
Lýsing
Škoda Plzeň, Turbogenerator set, condensate steam turbine 25 MW
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Lhedowqp U Eepfx Afwen
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Number of Extractions:1+3
Operation hours: 201000
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
Manufacturer: Škoda Plzeň
Power: 25 000 kW
Lhedowqp U Eepfx Afwen
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Steam temperature: 320 ºC
Number of Extractions:1+3
Operation hours: 201000
The equipment is from year 1995 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 4 700 x 6 200 mm,
Weight: 93 000
Generator, gearbox, condenser, condenser pumps, oil system and all related electro and InC equipment included.
We will send all technical data on request.
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. GO was carried out by the turbine manufacturer. The last GO was carried out in 2017 for a total amount of 112.6 million CZK. The following repairs were carried out:
- replacement of the old rotor with a new one,
- repair of the flow section of the stator and the distributor wheels and supports,
- replacement of the gearbox,
- repair of the regulation, oil. Repair of the system, condensation,
- installation of irrigation and new NZ,
Maintenance and servicing was carried out in the years after the GO, the inspection for subsequent repair was planned for 2024 and did not take place.
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Senda fyrirspurn
Sími & Fax
+420 370 ... auglýsingar
Þessar auglýsingar gætu einnig vakið áhuga þinn.
lítil auglýsing
Tékkneska lýðveldið
2.738 km
Gufuhverfla
Škoda PlzeňTurbogenerator set 25MW
Škoda PlzeňTurbogenerator set 25MW
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp