Amínhreinsun BGAA lífgasuppfærslaDGE
Aminwäsche BGAA Biogasaufbereitung
Amínhreinsun BGAA lífgasuppfærsla
DGE
Aminwäsche BGAA Biogasaufbereitung
VB aukaskattur bætist við
80.000 EUR
Ástand
Notað
Staðsetning
Weiskirchen 

Myndir sýna
Sýna kort
Upplýsingar um vélina
- Heiti vélar:
- Amínhreinsun BGAA lífgasuppfærsla
- framleiðandi:
- DGE
- Vélar númer:
- -
- Ástand:
- almennt endurnýjaður (notaður)
- virkni:
- fullkomlega virkur
Verð og staðsetning
VB aukaskattur bætist við
80.000 EUR
- Staðsetning:
- Zum Eichenlaubhof, 1, 66709 Saarland - Weiskirchen, DE
Hringdu
Tæknilegar upplýsingar
- Þrýstingur:
- 0,1 stöng
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A19034706
- uppfærsla:
- síðast þann 07.08.2025
Lýsing
Selling an amine scrubber, for example, for upgrading biogas to biomethane (natural gas quality).
Capacity in the biogas range: 450-550 Nm³/expandable to 650 Nm³/h
Cedewf Rwwopfx Aa Usrh
Up to 99.9% methane purity
Methane slip: 0.1%
Electricity requirement: 0.06 kWh/m³ raw gas
Heat requirement: 0.65 kWh/m³ raw gas
Simple CO2 extraction possible - liquefaction/dry ice
No exhaust gas treatment required compared to the membrane process with a lean gas burner - clear cost savings
Scrubber regeneration is equipped with heat recovery at 55/65 degrees Celsius
The plant can be expanded for the production of LNG with a CO2 content of less than 30 ppmv and less than 0.1 ppmv of water.
The amine process is exceptionally robust against impurities in the biogas stream and is characterized by high Plant availability is a factor. Compared to the membrane process, the amine scrubbing technology is significantly less sensitive to volatile organic compounds (VOCs; terpenes, ketones, siloxanes).
Plant immediately available/short delivery time
If you have any questions or are interested, please contact us by phone.
Amine scrubbing BGAA Biogas upgrading Biomethane Biogas CHP CO2 separator CNG LNG
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
Capacity in the biogas range: 450-550 Nm³/expandable to 650 Nm³/h
Cedewf Rwwopfx Aa Usrh
Up to 99.9% methane purity
Methane slip: 0.1%
Electricity requirement: 0.06 kWh/m³ raw gas
Heat requirement: 0.65 kWh/m³ raw gas
Simple CO2 extraction possible - liquefaction/dry ice
No exhaust gas treatment required compared to the membrane process with a lean gas burner - clear cost savings
Scrubber regeneration is equipped with heat recovery at 55/65 degrees Celsius
The plant can be expanded for the production of LNG with a CO2 content of less than 30 ppmv and less than 0.1 ppmv of water.
The amine process is exceptionally robust against impurities in the biogas stream and is characterized by high Plant availability is a factor. Compared to the membrane process, the amine scrubbing technology is significantly less sensitive to volatile organic compounds (VOCs; terpenes, ketones, siloxanes).
Plant immediately available/short delivery time
If you have any questions or are interested, please contact us by phone.
Amine scrubbing BGAA Biogas upgrading Biomethane Biogas CHP CO2 separator CNG LNG
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Skráð frá: 2023
Senda fyrirspurn
Sími & Fax
+49 6876 ... auglýsingar
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp