GluggasprautuverksmiðjaFINITURE
Fensterlackieranlage
Gluggasprautuverksmiðja
FINITURE
Fensterlackieranlage
föst verð aukaskattur bætist við
900 EUR
Framleiðsluár
2008
Ástand
Notað
Staðsetning
Pöllau bei Hartberg 

Myndir sýna
Sýna kort
Upplýsingar um vélina
- Heiti vélar:
- Gluggasprautuverksmiðja
- Framleiðandi:
- FINITURE
- Gerð:
- Fensterlackieranlage
- Vélar númer:
- IMBDS63-52-10-45-2/SP/DC/SB
- Framleiðsluár:
- 2008
- Ástand:
- notaður
- Virkni:
- fullkomlega virkur
Verð og staðsetning
föst verð aukaskattur bætist við
900 EUR
- Staðsetning:
- Pöllau bei Hartberg, Austurríki

Hringdu
Tæknilegar upplýsingar
- Hlutþyngd (mesta.):
- 120 kg
- Vinnuhæð:
- 2.850 mm
- Afl:
- 35 kW (47,59 hP)
- Loftþörf:
- 24.000 m³/klst
- Þjöppuð lofttenging:
- 6 stöng
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A20820642
- Tilvísunarnúmer:
- 268/7
- Uppfærsla:
- síðast þann 23.12.2025
Lýsing
The existing window coating line was in full operation until December 19, 2025. The system is currently still connected to the electrical supply network but will be replaced by a new robotic coating system over the turn of the year.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
Njdpfxex Npzcs Ad Dewc
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
Njdpfxex Npzcs Ad Dewc
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
Skjöl
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Skráð frá: 2025
Senda fyrirspurn
Sími & Fax
+43 664 3... auglýsingar
Þessar auglýsingar gætu einnig vakið áhuga þinn.
Lítil auglýsing
Herning
1.797 km
GLUGGAR
SCM GROUPWINDOR 60
SCM GROUPWINDOR 60
Lítil auglýsing
Pardubice
2.606 km
Tækni morbidelli
esa gvKVARA DIG.LIGHT 4A MECH.
esa gvKVARA DIG.LIGHT 4A MECH.
Lítil auglýsing
Gondelsheim
2.400 km
Krana himinn krani innanhúss krana krana flugbraut
Demag Portalkran KBK 250KGKBKI/II KBK1/2 8x4m 250Kg DC Kettenzug
Demag Portalkran KBK 250KGKBKI/II KBK1/2 8x4m 250Kg DC Kettenzug
Lítil auglýsing
Cantù
2.739 km
Hornrænt gluggavinnslumiðstöð
STETONTF 5
STETONTF 5
Lítil auglýsing
Oberkochen
2.483 km
Mala vél
LÖWERDSM 2004 Video
LÖWERDSM 2004 Video
Lítil auglýsing
Kežmarok
2.891 km
Sett af CNC gluggatöppum + fellivél
WeinigUnitec 10 + Univar 10
WeinigUnitec 10 + Univar 10
Lítil auglýsing
Aalen
2.482 km
Gluggamálunarlína
FINITUREPro Flow Impraegnieranlage
FINITUREPro Flow Impraegnieranlage
Lítil auglýsing
Wioska
2.441 km
PROLOGIC gluggasmíðahugbúnaður
PROLOGICFenOffice 14 Prologic
PROLOGICFenOffice 14 Prologic
Lítil auglýsing
Þýskaland
2.280 km
Iðnaðar vélmenni
Kuka KUKAKR60L30-3
Kuka KUKAKR60L30-3
Lítil auglýsing
Böblingen
2.449 km
Bekkurbor
MAXIONECOMAX 14
MAXIONECOMAX 14
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp





















































































