GluggasprautuverksmiðjaFINITURE
Fensterlackieranlage
Gluggasprautuverksmiðja
FINITURE
Fensterlackieranlage
föst verð aukaskattur bætist við
900 EUR
Framleiðsluár
2008
Ástand
Notað
Staðsetning
Pöllau bei Hartberg 

Myndir sýna
Sýna kort
Upplýsingar um vélina
- Heiti vélar:
- Gluggasprautuverksmiðja
- Framleiðandi:
- FINITURE
- Gerð:
- Fensterlackieranlage
- Vélar númer:
- IMBDS63-52-10-45-2/SP/DC/SB
- Framleiðsluár:
- 2008
- Ástand:
- notaður
- Virkni:
- fullkomlega virkur
Verð og staðsetning
föst verð aukaskattur bætist við
900 EUR
- Staðsetning:
- Pöllau bei Hartberg, Austurríki

Hringdu
Tæknilegar upplýsingar
- Hlutþyngd (mesta.):
- 120 kg
- Vinnuhæð:
- 2.850 mm
- Afl:
- 35 kW (47,59 hP)
- Loftþörf:
- 24.000 m³/klst
- Þjöppuð lofttenging:
- 6 stöng
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A20820642
- Tilvísunarnúmer:
- 268/7
- Uppfærsla:
- síðast þann 23.12.2025
Lýsing
The existing window coating line was in full operation until December 19, 2025. The system is currently still connected to the electrical supply network but will be replaced by a new robotic coating system over the turn of the year.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
Fsdpfxox Npzcs Ah Eoft
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
Fsdpfxox Npzcs Ah Eoft
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
Skjöl
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Skráð frá: 2025
Senda fyrirspurn
Sími & Fax
+43 664 3... auglýsingar
Þessar auglýsingar gætu einnig vakið áhuga þinn.
Lítil auglýsing
Oberkochen
2.483 km
Fjögurra hliðar planari
WEINIGProfimat 23 Fenster
WEINIGProfimat 23 Fenster
Lítil auglýsing
Pardubice
2.606 km
Tækni morbidelli
esa gvKVARA DIG.LIGHT 4A MECH.
esa gvKVARA DIG.LIGHT 4A MECH.
Lítil auglýsing
Rosmalen
2.026 km
Glugga framleiðslulína
WEINIGConturex Greenline Plus
WEINIGConturex Greenline Plus
Lítil auglýsing
Böblingen
2.449 km
Bekkurbor
MAXIONECOMAX 14
MAXIONECOMAX 14
Lítil auglýsing
Gorzów Wielkopolski
2.350 km
Fjögurra hliða heflavél CNC REIGNMAC RMM
REIGNMACRMM523U CNC
REIGNMACRMM523U CNC
Lítil auglýsing
Trzcianka
2.380 km
Vinnslustöð
CNC FelderProfit H20
CNC FelderProfit H20
Lítil auglýsing
Kassel
2.227 km
Fjarskipti
T740
T740
Lítil auglýsing
Krauchenwies
2.523 km
Nákvæm F stöðulengd sett
Beck Maschinenbau GmbHExakt F 3 Meter-Set
Beck Maschinenbau GmbHExakt F 3 Meter-Set
Lítil auglýsing
Kežmarok
2.891 km
Titringsinntak fyrir húsgagnaaðgang
3Master VibratoriAO-40 700S
3Master VibratoriAO-40 700S
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp
















































































