SalbyggingGraf
Leichtbauhalle
Salbygging
Graf
Leichtbauhalle
VB aukaskattur bætist við
20.000 EUR
Framleiðsluár
1990
Ástand
Notað
(takmörkuð virkni)
Staðsetning
Frankenthal (Pfalz) 

Grunnupplýsingar
- Heiti vélar:
- Salbygging
- Framleiðandi:
- Graf
- Gerð:
- Leichtbauhalle
- Framleiðsluár:
- 1990
- Ástand:
- tilbúinn til notkunar (notaður)
- Virkni:
- takmörkuð virkni
Verð og staðsetning
VB aukaskattur bætist við
20.000 EUR
- Staðsetning:
- Frankenthal, 67227 Frankenthal (Pfalz), Deutschland

Hringdu
Tæknilegar upplýsingar
Mál og þyngd
Heildarlengd:
91.000 mm
Heildarbreidd:
16.000 mm
Heildarhæð:
4.500 mm
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A23327045
- Uppfærsla:
- síðast þann 12.11.2026
Lýsing
The halls are constructed from galvanized steel sheet. The vertical supports (Figure 2) are also made of double-layer galvanized sheet and are not concreted in. A strip foundation made of wood/metal was built and secured to the ground with ground anchors, onto which the hall framework was placed and screwed. (20 mm nuts)
During disassembly, unscrew the sheet metal cladding; the longitudinal beams are only clipped in. If you release the lateral, diagonal braces, you can fold the individual frames together. If the loading area is short, you can separate the frames in the middle.
We have indicated the functionality as limited. This is not entirely accurate, but it is intended to emphasize that there are also minor collision damages where the sheet metal is dented. This concerns hall 2B – 92m x 16m = 1,460 square meters.
We will be closing the site on December 31, 2026, which is why we cannot offer any guarantee or warranty. Therefore, we are selling everything as DIY material or spare parts. Until December 31, we can assist with loading using a forklift. The hall must be dismantled by the buyer!!!
Four new, electric sectional doors were installed in the hall four months ago, for which we will charge an additional 4,000.00 € (gross) each!
Gsdj Ai Rmgepfx Afxoui
Inspections can be arranged on weekdays during normal office hours, subject to prior appointment.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
During disassembly, unscrew the sheet metal cladding; the longitudinal beams are only clipped in. If you release the lateral, diagonal braces, you can fold the individual frames together. If the loading area is short, you can separate the frames in the middle.
We have indicated the functionality as limited. This is not entirely accurate, but it is intended to emphasize that there are also minor collision damages where the sheet metal is dented. This concerns hall 2B – 92m x 16m = 1,460 square meters.
We will be closing the site on December 31, 2026, which is why we cannot offer any guarantee or warranty. Therefore, we are selling everything as DIY material or spare parts. Until December 31, we can assist with loading using a forklift. The hall must be dismantled by the buyer!!!
Four new, electric sectional doors were installed in the hall four months ago, for which we will charge an additional 4,000.00 € (gross) each!
Gsdj Ai Rmgepfx Afxoui
Inspections can be arranged on weekdays during normal office hours, subject to prior appointment.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
Skjöl
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Síðast á netinu: í síðustu viku
Skráð frá: 2026
10 Auglýsingar á netinu
Senda fyrirspurn
Sími & Fax
+49 6122 ... auglýsingar
Þessar auglýsingar gætu einnig vakið áhuga þinn.
Fullgengt
Skilaboðin þín hafa verið send.
Lítil auglýsing
Frankenthal (Pfalz)
2.344 km
Salbygging
GrafLeichtbauhalle
GrafLeichtbauhalle
Fullgengt
Skilaboðin þín hafa verið send.
Lítil auglýsing
Frankenthal (Pfalz)
2.344 km
Salbygging
GrafLeichtbauhalle
GrafLeichtbauhalle
Fullgengt
Skilaboðin þín hafa verið send.
Lítil auglýsing
Frankenthal (Pfalz)
2.344 km
Salbygging
GrafLeichtbauhalle
GrafLeichtbauhalle
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp
































