VinnslustöðGROB
G720F
Vinnslustöð
GROB
G720F
framleiðsluár
2023
Ástand
sýningavél
Staðsetning
Mindelheim 

Myndir sýna
Sýna kort
Upplýsingar um vélina
- Heiti vélar:
- Vinnslustöð
- Framleiðandi:
- GROB
- Gerð:
- G720F
- Framleiðsluár:
- 2023
- Ástand:
- næstum eins og ný (sýningavél)
Verð og staðsetning
- Staðsetning:
- Industriestraße 4, 87719 Mindelheim, DE

Hringdu
Tæknilegar upplýsingar
- X-áss færi:
- 1.450 mm
- Y-áss færsla:
- 1.200 mm
- Förfaravegalengd Z-áss:
- 1.035 mm
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A15979171
- Uppfærsla:
- síðast þann 15.12.2024
Lýsing
Highlights:
- fastest chip-to-chip time in this workspace dimension
- Optimum footprint
- Automation “ready”
_____
G720F machining center
X-axis travel = 1450 mm
Y-axis travel = 1200 mm
Z-axis travel = 1035 mm
Interference diameter 1,500 mm (2x)
table load 2x 750 kg
Work area lighting
Machine control Siemens Sinumerik ONE
HT10 handheld control unit
Motorized spindle 17,000 min-1, 64 Nm
GROB spindle diagnosis (GSD) for twin-spindle machines
Tool magazine, HSK-A-63 with 80 (2x40) tool pockets
Tool loading lift for parallel loading and unloading of tools during machining time
mechanic-tactile tool breakage check
HSK taper shaft cleaning
Air blow-off gun
Inspection window for viewing the tool change area/tool robot
Lighting in the tool change area/tool robot
Minimum quantity lubrication unit for two spindles as single-channel
Minimum quantity lubrication unit pressure booster
Decentralized exhaust system MQL
Scraper conveyor with wear plate
Bjdpfx Aotiyzdoh Hjlp
Basic installation Clamping functionality
Evaluation unit for monitoring support
evaluation unit for clamping monitoring - volume flow
Preparation for process-related measurement (Renishaw)
Renishaw RMP400 extra long measuring probe
Loading, directly into the machine by the operator
Two-hand operation, incl. automatic opening at the end of the cycle
HVO console
Preparation for direct loading into the machine by robot
Machine status light
- fastest chip-to-chip time in this workspace dimension
- Optimum footprint
- Automation “ready”
_____
G720F machining center
X-axis travel = 1450 mm
Y-axis travel = 1200 mm
Z-axis travel = 1035 mm
Interference diameter 1,500 mm (2x)
table load 2x 750 kg
Work area lighting
Machine control Siemens Sinumerik ONE
HT10 handheld control unit
Motorized spindle 17,000 min-1, 64 Nm
GROB spindle diagnosis (GSD) for twin-spindle machines
Tool magazine, HSK-A-63 with 80 (2x40) tool pockets
Tool loading lift for parallel loading and unloading of tools during machining time
mechanic-tactile tool breakage check
HSK taper shaft cleaning
Air blow-off gun
Inspection window for viewing the tool change area/tool robot
Lighting in the tool change area/tool robot
Minimum quantity lubrication unit for two spindles as single-channel
Minimum quantity lubrication unit pressure booster
Decentralized exhaust system MQL
Scraper conveyor with wear plate
Bjdpfx Aotiyzdoh Hjlp
Basic installation Clamping functionality
Evaluation unit for monitoring support
evaluation unit for clamping monitoring - volume flow
Preparation for process-related measurement (Renishaw)
Renishaw RMP400 extra long measuring probe
Loading, directly into the machine by the operator
Two-hand operation, incl. automatic opening at the end of the cycle
HVO console
Preparation for direct loading into the machine by robot
Machine status light
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Skráð frá: 2019
Senda fyrirspurn
Sími & Fax
+49 8261 ... auglýsingar
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp
























