RennslisskurðarlínaHGG Profiling Equipment
PLC 600 Plasma
Rennslisskurðarlína
HGG Profiling Equipment
PLC 600 Plasma
Framleiðsluár
2009
Ástand
Notað
Staðsetning
Bretland 

Upplýsingar um vélina
- Heiti vélar:
- Rennslisskurðarlína
- Framleiðandi:
- HGG Profiling Equipment
- Gerð:
- PLC 600 Plasma
- Framleiðsluár:
- 2009
- Ástand:
- notaður
Verð og staðsetning
- Staðsetning:
- United Kingdom

Hringdu
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A22702577
- Uppfærsla:
- síðast þann 07.09.2026
Lýsing
2009 HGG Profiling Equipment PLC 600 Plasma CNC Profile Cutting Line with Procam Software
Dcodpfjzy Itvex Adgsl
Cutting Capacity Pipe Range Ø48-Ø610mm. Maximum Cutting Angle 45°. Maximum Pipe Weight 3 Ton. Note: Hard Drive Has been Removed For Sale, Replacements Are Readily Available From HGG. With Fume Extraction Unit, Safety Light Curtain Guards & Signal Tower. Due to new investment the machine must be decommissioned and removed from site by the 2nd of October 2026. Upon clearance of suitable RAMS and certification by BAE Systems any UK rigger can access the site to remove the assets. Induction will be required. UK residents only to be authorised on site.
Due to new investment the machine must be decommissioned and removed from site by the 2nd of October 2026. Upon clearance of suitable RAMS and certification by BAE Systems any UK rigger can access the site to remove the assets. Induction will be required. UK residents only to be authorised on site.
Dcodpfjzy Itvex Adgsl
Cutting Capacity Pipe Range Ø48-Ø610mm. Maximum Cutting Angle 45°. Maximum Pipe Weight 3 Ton. Note: Hard Drive Has been Removed For Sale, Replacements Are Readily Available From HGG. With Fume Extraction Unit, Safety Light Curtain Guards & Signal Tower. Due to new investment the machine must be decommissioned and removed from site by the 2nd of October 2026. Upon clearance of suitable RAMS and certification by BAE Systems any UK rigger can access the site to remove the assets. Induction will be required. UK residents only to be authorised on site.
Due to new investment the machine must be decommissioned and removed from site by the 2nd of October 2026. Upon clearance of suitable RAMS and certification by BAE Systems any UK rigger can access the site to remove the assets. Induction will be required. UK residents only to be authorised on site.
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Skráð frá: 2023
19 Auglýsingar á netinu
Senda fyrirspurn
Sími & Fax
+44 1273 ... auglýsingar
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp












