GUFUFRAMLEIÐSLULÍNAICI Caldaie
ICI SIXEN 500
GUFUFRAMLEIÐSLULÍNA
ICI Caldaie
ICI SIXEN 500
EXW VB aukaskattur bætist við
40.000 EUR
Framleiðsluár
2018
Ástand
Notað
(fullkomlega virkur)
Staðsetning
Cluj-Napoca 

Grunnupplýsingar
- Heiti vélar:
- GUFUFRAMLEIÐSLULÍNA
- Framleiðandi:
- ICI Caldaie
- Gerð:
- ICI SIXEN 500
- Vélar númer:
- 100034004
- Framleiðsluár:
- 2018
- Ástand:
- mjög gott (notað)
- Virkni:
- fullkomlega virkur
- Vinnustundir:
- 4.000 h
Verð og staðsetning
EXW VB aukaskattur bætist við
40.000 EUR
- Staðsetning:
- Cluj-Napoca, Rúmenía

Hringdu
Tæknilegar upplýsingar
Mál og þyngd
Tómass:
3.000 kg
Heildarlengd:
5.000 mm
Heildarbreidd:
5.000 mm
Heildarhæð:
2.000 mm
Vökvaknúð kerfi
Rekstrarþrýstingur:
12 stöng
Upplýsingar um afl
Inntakstraumsgerð:
þriggja fasa
Skjöl og vottun
Ábyrgðartími:
24 mánuðir
Frekari upplýsingar
Stjórnrofaslåsshæð:
1.000 mm
Stjórnskápslengd:
500 mm
Stjórnskápbreidd:
500 mm
Nominallur varmaafl:
341 kW (463,63 hP)
Þrýstingur:
12 stöng
Tankrýmd:
3.000 l
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A23368993
- Tilvísunarnúmer:
- SIXEN
- Uppfærsla:
- síðast þann 22.11.2026
Lýsing
Complete industrial natural-gas steam-generation plant based on an ICI Caldaie SIXEN 500 steam generator, installed in 2018 and originally designed to supply an EPS production facility.
The installation includes the steam generator together with the main burner, water-treatment, deaeration, blowdown, TDS-control, feed-water and steam-distribution auxiliaries.
ICI SIXEN 500 steam generator
- Nominal steam production: 500 kg/h with feedwater at 80°C
- Maximum useful output: 341 kW
- Design pressure: 12 bar
- Typical operating pressure: approx. 8–11.5 bar
- Fuel: natural gas
- Original supplier documentation: CE / PED 2014/68/EU
Main auxiliaries include:
- Riello RS 44 MZ TL two-stage natural-gas burner
- Automatic boiler-bottom blowdown system
- Electrical TDS / salinity control
- Boiler-water sample cooling device
- Atmospheric deaerator, approx. 500 L/h
- Duplex water-softening station
- Chemical water-treatment / dosing equipment
Ljdpfxs Alglbe Alysrw
- Feed-water pumps
- Automation for unattended operation
- D168 steam distribution manifold with 5 flanged outlets
- Associated valves, instrumentation and steam-system accessories
Additional steam-system equipment available with the installation includes:
- 3,000 L PED steam receiver / pressure vessel, 12 bar
- SP24 thermal-plant automation and controls
- Related control cabinet, pressure transmitter, alarm and interface functions
- Hydraulic and engineering connections associated with the original thermal-plant installation
The system is currently installed and can be inspected before dismantling.
Original supplier documentation and project documentation are available.
The steam-generation plant can be purchased independently or together with the separately available Fangyuan EPS production equipment.
Sale basis: EXW Cluj, Romania. Dismantling, disconnection, loading and transport are by the buyer unless otherwise agreed.
The installation includes the steam generator together with the main burner, water-treatment, deaeration, blowdown, TDS-control, feed-water and steam-distribution auxiliaries.
ICI SIXEN 500 steam generator
- Nominal steam production: 500 kg/h with feedwater at 80°C
- Maximum useful output: 341 kW
- Design pressure: 12 bar
- Typical operating pressure: approx. 8–11.5 bar
- Fuel: natural gas
- Original supplier documentation: CE / PED 2014/68/EU
Main auxiliaries include:
- Riello RS 44 MZ TL two-stage natural-gas burner
- Automatic boiler-bottom blowdown system
- Electrical TDS / salinity control
- Boiler-water sample cooling device
- Atmospheric deaerator, approx. 500 L/h
- Duplex water-softening station
- Chemical water-treatment / dosing equipment
Ljdpfxs Alglbe Alysrw
- Feed-water pumps
- Automation for unattended operation
- D168 steam distribution manifold with 5 flanged outlets
- Associated valves, instrumentation and steam-system accessories
Additional steam-system equipment available with the installation includes:
- 3,000 L PED steam receiver / pressure vessel, 12 bar
- SP24 thermal-plant automation and controls
- Related control cabinet, pressure transmitter, alarm and interface functions
- Hydraulic and engineering connections associated with the original thermal-plant installation
The system is currently installed and can be inspected before dismantling.
Original supplier documentation and project documentation are available.
The steam-generation plant can be purchased independently or together with the separately available Fangyuan EPS production equipment.
Sale basis: EXW Cluj, Romania. Dismantling, disconnection, loading and transport are by the buyer unless otherwise agreed.
Skjöl
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Síðast á netinu: í síðustu viku
Skráð frá: 2026
3 Auglýsingar á netinu
Senda fyrirspurn
Sími & Fax
+40 764 9... auglýsingar
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp