MálverkstæðiPony Luxury Coating
Pony L11000 (11x5x5)
Málverkstæði
Pony Luxury Coating
Pony L11000 (11x5x5)
framleiðsluár
2025
Ástand
Nýtt
Staðsetning
Würzburg 

Myndir sýna
Sýna kort
Upplýsingar um vélina
- Heiti vélar:
- Málverkstæði
- Framleiðandi:
- Pony Luxury Coating
- Gerð:
- Pony L11000 (11x5x5)
- Framleiðsluár:
- 2025
- Ástand:
- nýtt
- Virkni:
- fullkomlega virkur
Verð og staðsetning
- Staðsetning:
- Schulstr 3, 97084 Würzburg, Deutschland

Hringdu
Tæknilegar upplýsingar
- Heildarhæð:
- 5.600 mm
- Heildarlengd:
- 11.200 mm
- Heildarbreidd:
- 5.100 mm
- Inntakstraumsgerð:
- þriggja fasa
- Ábyrgðartími:
- 24 mánuðir
- Innri hæð:
- 4.970 mm
- Innri lengd:
- 11.000 mm
- Hiti:
- 80 °C
- Innri breidd:
- 5.000 mm
- Loftþörf:
- 52.000 m³/klst
- Inngangsspenna:
- 380 V
- Hitageta:
- 250 kW (339,91 hP)
- Afl:
- 45 kW (61,18 hP)
- Eldsneyti:
- fljótandi jarðolíugas (LPG)
- Inngangstíðni:
- 50 Hz
- Orkunotkun:
- 45 kWh
- Einangrunarþykkt:
- 50 mm
- Nafnafl:
- 250 kW (339,91 hP)
- Stálplötur - hámark þykkt:
- 2 mm
- Búnaður:
- lýsing
Tilboðsupplýsingar
- Auglýsingarauðkenni:
- A19572531
- Uppfærsla:
- síðast þann 07.10.2025
Lýsing
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
Nodpfx Aswzl Hxeatswp
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
Nodpfx Aswzl Hxeatswp
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Þessi auglýsing var sjálfvirkt þýdd. Villa í þýðingu gæti verið til staðar.
Skjöl
Bjóðandi
Athugasemd: Skráðu þig ókeypis eða skráðu þig inn, til að fá aðgang að öllum upplýsingum.
Senda fyrirspurn
Sími & Fax
+49 176 7... auglýsingar
Þessar auglýsingar gætu einnig vakið áhuga þinn.
lítil auglýsing
Velen
2.072 km
Handverkfæri
HBMKrimpzange Akku
HBMKrimpzange Akku
lítil auglýsing
Großenlüder
2.293 km
Sandblásturskerfi, sandblásturshöll
Oliver Fritz GmbH & Co. KGStrahlhaus Easy 10mx5mx5m LxBxH
Oliver Fritz GmbH & Co. KGStrahlhaus Easy 10mx5mx5m LxBxH
lítil auglýsing
Wielka Nieszawka
2.475 km
GANTRY CRANE 5T - NÝTT
WNM Sp. Z O.O.
WNM Sp. Z O.O.
lítil auglýsing
Büyükkayacık OSB
4.466 km
Lágur hleðslutæki
GVN Trailer3 Axle Hydraulic Platform Lowbed
GVN Trailer3 Axle Hydraulic Platform Lowbed
lítil auglýsing
Parma
2.870 km
Byggingarvélar með lágum hleðslutækjum
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
lítil auglýsing
Nettetal
2.100 km
Duftofn
KM IndustrieserviceElektro Kammerofen KM Pro
KM IndustrieserviceElektro Kammerofen KM Pro
lítil auglýsing
Malax
1.967 km
Giardini GST UV þurrkagöng
GiardinaGST 1401/3+2
GiardinaGST 1401/3+2
lítil auglýsing
Büyükkayacık OSB
4.466 km
Lágur hleðslutæki
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
lítil auglýsing
Toruń
2.477 km
Málningar klefi 12x5x5 m með undirstöðu
ABC-Group
ABC-Group
lítil auglýsing
Würzburg
2.391 km
Málverkstæði
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Auglýsingunni þinni hefur verið eytt með góðum árangri
Villa kom upp

























































































